The text opposite explains why the Dynamic versus As-planned v As-built Critical Path Calculator:
-
Is required to provide a factual assessment and determination of the Dynamic critical path and their sub-critical paths and the APAB actual critical path and sub-critical paths.
-
It explains the difference between the Dynamic CP's and the APAB CP's and explains:
-
why in retrospective delay analysis the APAB determination of criticality is preferred.
-
why for a prospective delay analysis a TIA method is preferred.
The text then explains how the Calculator gets its data from the baselines and the contemporaneous progress updates thereof the baselines.
A copy of the document in PDF can be found here