In the previous page titled: "DYNAMIC v APAB CP REASON" a long version of the explanation around the two CP calculations was provided and why and when retrospective delay analysis is preferred to prospective delay analysis.

On this page the text to right provides a simplified calculation example of how to calculate the APAB critical path from the actual % complete provided at each update for in-progress activities. 

A PDF copy of the text can be downloaded here